Long Lead – Small clip (Smaller breeds)

Long Lead – Small clip (Smaller breeds)

£10.00

Walk with purpose and pride using our bright yellow Therapy Dogs Nationwide lead. Designed for visibility, comfort, and durability, this lead is perfect for handlers and their therapy dogs representing TDN on visits or in public settings.

  • Bold “Therapy Dog” text printed along the length of the lead
  • Made from strong, lightweight webbing with a smooth finish
  • Metal clip for secure attachment to your dog’s collar or harness
  • Vibrant yellow colour for easy visibility and recognition

LEAD WITH SMALL CLIP FOR SMALLER BREEDS – 36″ x 0.5″

Show your support and professionalism with every step you take.

17

In stock

Available in the following sizes:

In stock

Got to basket

Our Other Products

Polo Shirt

£27.00

Select Options This product has multiple variants. The options may be chosen on the product page

Hoodie

£35.00

Select Options This product has multiple variants. The options may be chosen on the product page

Zoodie

£35.00

Select Options This product has multiple variants. The options may be chosen on the product page

T-Shirt

£20.00

Select Options This product has multiple variants. The options may be chosen on the product page

Summer t-shirt (Reduced to Clear)

Original price was: £20.00.Current price is: £12.50.

Select Options This product has multiple variants. The options may be chosen on the product page
Select Options This product has multiple variants. The options may be chosen on the product page
Select Options This product has multiple variants. The options may be chosen on the product page

Long Lead

£10.00

Select Options This product has multiple variants. The options may be chosen on the product page

New Bandana

Price range: £9.50 through £12.00

Select Options This product has multiple variants. The options may be chosen on the product page

Slip

Price range: £14.50 through £25.50

Select Options This product has multiple variants. The options may be chosen on the product page