Long Lead
Long Lead
£10.00
Walk with purpose and pride using our bright yellow Therapy Dogs Nationwide lead. Designed for visibility, comfort, and durability, this lead is perfect for handlers and their therapy dogs representing TDN on visits or in public settings.
- Bold “Therapy Dog” text printed along the length of the lead
- Made from strong, lightweight webbing with a smooth finish
- Metal clip for secure attachment to your dog’s collar or harness
- Vibrant yellow colour for easy visibility and recognition
Long Lead 36″ x 1″ – medium to large dogs
Show your support and professionalism with every step you take.
26
In stock
Available in the following sizes:
- 1/2 inch
- 1 inch
Got to basket
Our Other Products
Polo Shirt
£27.00
Select Options
This product has multiple variants. The options may be chosen on the product page
Hoodie
Original price was: £35.00.£30.00Current price is: £30.00.
Select Options
This product has multiple variants. The options may be chosen on the product page
Zoodie
£35.00
Select Options
This product has multiple variants. The options may be chosen on the product page
T-Shirt
£20.00
Select Options
This product has multiple variants. The options may be chosen on the product page
Therapy Dog Collar
£10.00
Select Options
This product has multiple variants. The options may be chosen on the product page
Training Lead
£12.00
Select Options
This product has multiple variants. The options may be chosen on the product page
Long Lead
£10.00
Select Options
This product has multiple variants. The options may be chosen on the product page
New Bandana
Price range: £9.50 through £12.00
Select Options
This product has multiple variants. The options may be chosen on the product page
Slip
Price range: £14.50 through £25.50
Select Options
This product has multiple variants. The options may be chosen on the product page
